top of page

Design Review Committee

The Design Review Committee (DRC) is dedicated to maintaining the unique aesthetic standards and architectural integrity of Wissler Ranch. By overseeing property and housing visuals, we work to protect our neighborhood character and preserve the long-term value of our community for all homeowners.

​

Rules & Standards

Covenants require all structures, landscaping, and other site modifications to conform with the Covenants and Design Review Guidelines and be approved in advance of the start date by the Design Review Committee.  Approval of location, design, materials, and grade modification is required before any improvement(s) is/are initiated on any lot. This includes but is not limited to: initial construction, additions, driveways, septic systems, outbuildings, storage facilities, façade changes, fencing, landscaping, hardscaping, playscapes, as well as pet fencing, enclosures and dog houses and all outdoor lighting of any kind.

Architecture
  • Maintain architectural style consistency across the community.
  • Preserve the high-aesthetic character of the foothills region.
Exterior Materials
  • Use natural exterior materials and approved earth-tone colors.
  • Protect the property visuals from clashing or modern contrasts.
Rooflines
  • Approved roofing materials that blend with the surroundings.
  • Roofline designs must respect neighborhood sightlines.
Fencing
  • Standardized fencing styles for consistency across boundaries.
  • Height and material requirements strictly enforced.
Landscaping
  • Maintaining forest integrity and native vegetation.
  • Plans for outbuildings and screening of utilities required.
Utilities & Outbuildings
  • Screening for all exterior utilities and waste containers.
  • Outbuildings must mirror the primary residence's aesthetics.
All property changes and construction must comply with Wissler Ranch Covenants and Design Review Guidelines.

Application Process

Follow these steps to submit your project to the Design Review Committee. All modifications must be approved in writing before any work begins on your property.

01

Prepare Submission

Gather detailed plans including site maps, architectural drawings, material samples, and color swatches as required by the Design Review Guidelines.

02

Send Documents

Submit your complete application form and supporting documents via the community portal or email to the committee contact address.

03

Committee Review

The Design Review Committee will evaluate your proposal against the community standards. Review timelines typically take 15 to 30 days.

04

Approval & Construction

Once written approval is received, you may obtain necessary local permits and begin your project. Construction must follow the approved plans exactly.

05

Final Inspection & Approval

Once your construction is completed the Design Review Committee will perform a final inspection and approval.

bottom of page